Lloyd Sudamericano

www.lloyd-group.com
 
www.lloyd-group.com    Home | Company | Port Data | Port Operations| Links | Contact Us

Port Data

Bauxilum

 

Industrial Area Matanzas

Sidor Terminal

Venalum Pier

Alcasa Pier

Bauxite

 

Puerto Ordaz Area

Ferrominera Terminal

Palua Termina

Edelca Terminal

San Felix Pier

 

Other

Boca Grande Transfer Station

Bauxilum Pier (Alumina & Soda Caustic)

Orinoco Wood Chips

Description

This type of cargo is now being transported fm pijiguaos mine to interalumina berth by barges ( mississippi type barges).

Operation wl be carried out at midstream with cargo loaded onboard the ocean vsl directly fm barges (starboard-port side)

Vsl has to be self loading equipped with grabs, no grabs available for hiring ashore.

Crewmembers are allowed by port regulations to operate cranes/grabs, however shore crane drivers are available at usd 0,50 x mt all included.

The barge capacity is abt 1.800mt each, it means that 2 convoys of barges coming fm pijiguaos wl be enough to fill up the vsl with abt 36.000 mt bauxite.

Barges dimension are abt 60 m length by 20 m width.

We must to point out that bauxite coming fm pijiguaos has a high index of water content. Specially during rainy season (may-november).

The operation wl be developed at mile 191-195 (interalumina roads), suggest to instruct master to anchor with two anchors to avoid dragging, fyg the current force during high water season (june-oct) is 5-6 knots. (see below a drawing of anchoring zone)

 

 

Pictures

Aerial Pictures




 
Layouts

Other Documents

Printable Version

Ask a Question

Do you have a question about this port? CONTACT US

 

Lloyd Group. All right reserved.

Design by www.myisit.com